The Action | Work Structure

The structure of the work programme enabled the optimal achievement of the envisaged objectives and the timely provision of the proposed outcomes of this action. In this context, the overall work was clustered into 10 Work Packages (WPs) that complement each other as presented in the following flow chart of the work programme: